Global Ice Sheet Mapping Orbiter (GISMO)
Table of contents
GISMO Documentation
Public Access Documents. Click on the document name to download it.
Radar
Radar Design Trade-off
Antenna Pattern
Antenna Pattern Excel Sheet
InSAR Concept
InSAR Parameters Trade Study
Radar Parameters
Radar Electronics Design
P-3 Antennas
Photo
Geophysical requirements
Dimensions of Subglacial Water Bodies
Thickness Accuracy
GISMO Antenna Design Report for April 07 Experiment
Antenna Report from KU
GISMO Processing Diagram
GISMO Processing Diagram
2005 and 2006 Team Meeting and Documents
2005 Team Meeting and Documents
Click on the document name to download it. Note: Some team documents are not available.
2005 Documents
GISMO Response to NRC Decadal Survey RFI
GISMO Meeting Agenda Sept 2005
GISMO Science Requirements
GISMO QUAD Chart
GISMO Team Meeting, Sept. 2005, Algonquin State Park
Final Agenda
Science Requirements (Jezek)
KU Radar (Gogineni)
GISMO Concept (Rodriguez)
Simulations (Wu)
Subglacial Topography (Tulaczyk)
GISMO DEM (Jezek)
Ionospheric Effects (Freeman)
Project Links (Jezek)
ESTO Reporting Requirements (Jezek)
Aircraft Options Summary
2005 Reports
2006 Team Meeting and Documents
January 2006 Mid-year Review
February 2006 Airborne Experiment Meeting WFF
Vu-graph Package
Meeting Summary
May 2006 Team Meeting, Vexcel Corp
Agenda, Summary, Plans
Radar Status
Airborne Simulations
May 06 Field Study Summary
Surface-based SAR Summary
Cards Data Format
Scattering Models
Planning Meeting for April 07 — WFF October 06
Overview (Jezek)
Review of May 06 Radar (Gogineni)
Review of May 06 Navigation (Sonntag)
Lessons Learned
Radar for 07 (Gogineni)
Flight Organization (Valiant)
2006 Reports
Jan 2006
March 2006
May 2006
Year 1 Annual Report (.doc)
Year 1 Annual Report (.pdf)
Year 1 Review (.ppt)
August 2006
December 2006
May 2006 Field Program
Experiment Operations Plan
Related Flight Locations
Preflight Planning and Analysis
Motion Data
Motion Data Description
Precise Trajectory
Precise Trajectory Readme
Ice-thickness plots
Ice Thickness 1
Ice Thickness 2
Ice Thickness 3
Ice thickness 4
2007 and 2008 Team Meetings and Documents
2007 Team Meetings and Documents
Click on the document name to download it. Note: Some team documents are not available.
January 2007 Mid-year Review
Mid-year Review Vu-graphs
Mid-year Review Vu-graphs Updated Post Review
GISMO Team Meeting JPL, January 31
PARCA Presentation (Rodriguez)
Progress to Date
Status and Summary of Mid-year Review, Budget Issues (Jezek)
Planning for April 07 Experiment
Science and Engineering Objectives for April 2007 (Jezek)
Radar and Antenna Status (Gogineni)
Vexcel Data Processing Status, Interface and Readiness (Refraction, Motion Compensation, Calibration) (Wu)
JPL Data Processing Status, Interface and Readiness (Refraction, Motion Compensation, Calibration) (Rodriguez)
Navigation (Sonntag)
Arctic 07 Planning Status and Key Milestones (Krabill)
Proposed Flight Lines 1, 2, 3 (Fahnestock and Sonntag) and Discussion
April 07 Experiment Plan and Discussion (Jezek) (see May 06 vu-graphs for sample experiment plan form)
Algorithms, February 1
Tomography Algorithm Status (Wu) (covered above)
InSAR Algorithm Status (Rodriguez)
Update on Multiaperture Beam Processing (Gogineni) (covered above)
Plans for Reducing May 2006 Data to Topography (Wu, Rodriguez, Forster)
Plans for Investigating Ionospheric Effects and Corrections (Freeman)
Data Management Issues, Schedule for Delivery of April 07 Data, Action Items (Jezek)
Vexcel Algorithm Meeting, June 2007
Agenda
Processor Review
Summary and Action Items
Updated InSAR Equation
June 2007 Mid-year Review
2007 Annual Review
Freeman Backup Vu-graphs to Annual Review
August 2007 Radar Readiness Review (KU)
Readiness Review (Gogineni)
Digital Systems (Ledford)
Calibration (Rodriguez)
Processor Status (Wu)
Experiment Plan (Jezek)
Thin Layer Model (Niamsuwan)
2007 Biannual Reports
April 2007 Field Program
Calibration and Geometry Check List
Experiment Plan
Experiment Summary
Radar data available from KU (about 5 Gb)
Motion Data
September 2007 Field Program
Pre Mission
Calibration and Geometry Check List
Experiment Plan
Schedule
Range Window Analysis
Post Mission
Trip Report
Radar Calibration Report
Post Mission Data Review
Ice Sheet Roughness Report
Quick-look Motion Files
070907
070908
070910
070911
070912
070914
070915
070918
KU GPS Files
070907
070908
070910
070911
070912
070914
070915
070918
Sample Data
Sept 11 150 Gismo 22000ft Ice Stream
Sept 8 450 GISMO 22000ft Ice Stream
Sept 12 150 GISMO 1500 FT Ice Stream: File 1, File 2